• Solutions
    Solutions

    Testlio maximizes software testing impact by offering comprehensive AI-powered solutions for your toughest quality challenges.

    Learn more

    Featured
    Payments Testing

    Read on

    • Fused

      Integrate automated and manual testing

    • Offerings

      Experience holistic software testing

    • Services

      Partner with experts for breakthrough results

    • Coverage

      Devices, languages, locations, payments and more

    • Methodologies

      Transform quality reliability, impact, and value

    • Network

      Access top-quality testing talent

  • Industries
    Industries

    Testlio empowers diverse industries by providing tailored testing strategies to overcome unique challenges and drive success.

    Press release
    Unmatched Flexibility Fuels Market Adoption for Testlio’s Managed Test Automation Solution

    Read on

    • Commerce & Retail

      Refine shopping with expert testing

    • Finance & Banking

      Fortify financial services through secure testing

    • Health & Wellness

      Boost well-being with meticulous testing

    • Media & Entertainment

      Deliver top-quality content via thorough testing

    • Learning & Education

      Boost education with optimized experiences

    • Mobility & Travel

      Revolutionize travel with comprehensive testing

    • Software & Services

      Achieve excellence using trusted testing solutions

  • Platform
    Platform

    Testlio revolutionizes testing through a cutting-edge platform, streamlining processes and empowering seamless collaboration.

    Learn more

    Generative AI and QA
    Will AI Replace Software Quality Assurance Roles?

    Read on

    • Testing Management

      Streamline, oversee, and execute all testing processes

    • People Management

      Source, verify, and manage global testing professionals

    • Device Management

      Access and manage real and cloud-based devices

    • Decision Management

      Drive strategies with data-driven insights and adjustments

    • Integrations

      Optimize workflows with smooth DevOps integrations

  • Insights
    Insights

    Testlio uncovers data-driven insights, transforming your testing approach and accelerating success.

    Learn more

    Featured
    Part I: Yes, Software Quality Strategy is a Requirement For Comprehensive QA 

    Read on

    • Trends

      Stay ahead with cutting-edge testing trends and innovations

    • Perspectives

      Gain expert viewpoints on diverse testing topics and challenges

    • Advice

      Leverage valuable guidance for informed testing decisions

    • Basics

      Master the fundamentals of effective software testing

  • About
    About

    Discover the driving forces behind Testlio's passion for outstanding testing solutions.

    Learn more

    • Identity
    • Our Story

      Learn about our journey and origin

    • Leadership

      Get to know the faces behind Testlio

    • Culture

      Discover our values and working environment

    • Distinction
    • Differences

      Uncover Testlio’s unique edge and competitive excellence

    • Clients

      Explore why digital leaders choose Testlio

    • Partners

      See who we work with to deliver excellence

    • Impact
    • News
    • Events
    • Social Impact
    • Diversity, Equity and Inclusion
    • Blog
  • Work
    Work

    Explore remote-friendly, flexible opportunities and join our mission to enable human possibilities.

    Learn more

    • Type
    • Full-Time

      Permanent job, 40 hrs/week

    • Freelance Work

      Project-based, self-employed, services multiple clients

    • Part-Time

      Fewer hours than full-time, 20-30 hrs/week

    • Temporary

      Short-term job, for specific period/task

    • Team
    • Platform
    • Operations
    • Growth
    • Delivery
    • Quality
    • Location
    • APAC
    • AMER
    • EMEA
Sign in Contact sales
Contact sales

Understanding Risk-Based Testing in Software Testing

Suppose you’re working on a complex software project with a tight deadline. Your team has limited time and resources, but the application is growing in complexity with each sprint. Testing every feature thoroughly is impossible, so how do you decide what to test first?

Putu Kusumawardhani , Director, Client Impact, Testlio
March 7th, 2025

This is where Risk-Based Testing (RBT) becomes essential. RBT prioritizes testing efforts based on risk. It focuses on areas most likely to fail or have the highest business impact. 

This approach is particularly valuable in fast-paced Agile and DevOps environments, where frequent releases demand smarter testing strategies.

In this article, you’ll learn everything you need to know about risk-based testing. We’ll cover how it works, why it matters, and how to implement it effectively.

You’ll learn to prioritize testing efforts based on risk, explore different RBT techniques, compare them to other testing approaches, and understand best practices for maximizing efficiency.

By the end, you’ll have a clear, actionable strategy for integrating risk-based testing into your workflow.

Table of contents

  • What is Risk-Based Testing?
  • What are the Core Concepts?
  • Risk-Based Testing Techniques
  • Risk-Based Testing Process
  • Measuring the Success of Your Testing Efforts
  • Challenges Involved with Risk-Based Testing
  • Risk-Based Testing vs. Other Testing Approaches
  • Best Practices for Risk-Based Testing
  • Risk-Based Testing in Agile
  • Final Thoughts

What is Risk-Based Testing?

Not all parts of a software application carry the same level of risk. Some features are business-critical, while others are less impactful if they fail. 

That’s where risk-based testing comes in. It prioritizes testing efforts based on risk, ensuring the most critical and vulnerable areas get the attention they deserve. 

It starts by assessing key risk factors. Business impact determines how failures affect users, while the likelihood of failure identifies components prone to defects. 

For example, in an e-commerce platform, the checkout process, payment gateway, and order fulfillment system are high-risk areas because failures can lead to lost revenue and frustrated customers. 

Meanwhile, minor UI changes on a product description page pose a much lower risk. The purpose is to thoroughly test critical functions while reducing unnecessary effort in low-priority areas.

Risk-based testing is especially useful when:

  • Deadlines are tight: If a release is approaching, focusing on high-risk areas ensures crucial functionality is covered.
  • The system is complex: Applications with many integrations and dependencies benefit from targeted testing.
  • Resources are limited: If there aren’t enough testers or budget, risk-based testing makes sure effort goes to the most important parts.
  • Frequent changes are made: Agile and DevOps teams use this approach to ensure updates don’t break high-risk features.

What are the Core Concepts?

Risk-based testing involves three key steps: risk identification, risk assessment, and risk mitigation. 

Each step plays a crucial role in ensuring that the testing process is focused on the areas that matter most, balancing effort, resources, and project priorities. 

Let’s break each step down in detail:

Risk Identification

The first step in risk-based testing is recognizing potential risks that could impact software quality. 

Risks can come from various sources, such as complex code, business-critical functionalities, frequent changes, or integration dependencies. 

Teams can focus their testing efforts where they are needed most by identifying these risks as early as possible.

There are several ways to identify risks:

  • Workshops and brainstorming sessions: Teams can discuss potential problem areas based on past experiences, assumptions or project complexities.
  • Lessons from previous projects: Looking at defects from past releases helps pinpoint recurring vulnerabilities.
  • Expert input: Consulting domain experts, business analysts, or security specialists can highlight risks that might not be obvious.
  • Checklists and root cause analysis: Using structured checklists and investigating past defects can help identify hidden risks.
  • Risk Breakdown Structure (RBS): A framework that categorizes risks based on different project aspects, helping prioritize areas that need attention.

All identified risks are documented in a Risk Register, a spreadsheet that tracks each risk, its potential impact, root causes, and planned responses.

Risk Assessment

Once risks are identified, the next step is analyzing them to determine which ones need immediate attention. 

Not all risks are equally critical. Some may result in system failures, while others may only cause minor inconveniences.

There are two primary ways to assess risk:

  • Qualitative Analysis: Risks are categorized based on likelihood and impact. A Risk Matrix helps visualize this, ranking risks from low to high priority.
  • Quantitative Analysis: Assigns numerical values to risks, estimating potential losses or probability percentages to calculate risk exposure.

You can use the risk register both for quantitative and qualitative analysis:
risk matrix

When assessing risks, consider the following key factors: 

  • Evaluate the business impact by determining how critical the feature is and whether its failure could affect revenue, security, company reputation or user experience. 
  • Assess the likelihood of failure by examining if the area is known for defects, has changed recently, or has become more complex. 
  • Pay extra attention to regulatory or security concerns, especially for features that handle sensitive data or have compliance requirements.

These factors determine the priority of testing efforts. This ensures that the most significant risks are tested first and that less critical areas receive minimal but sufficient coverage.

Risk Mitigation

While it’s important to identify and assess risks, the real value comes from effectively managing them. Risk mitigation focuses on reducing the probability or impact of potential failures.

Once risks are assessed, teams decide how to handle them. The four types of risk mitigation techniques are:

  • Avoidance: Adjusting design or requirements to eliminate high-risk areas.
  • Mitigation: Taking proactive steps to reduce the risk, such as adding extra test cases, improving documentation, or implementing monitoring tools.
  • Acceptance: Acknowledging a risk and preparing contingency plans if it occurs.
  • Transfer: Shifting the risk to another party, such as using third-party security services to handle compliance risks.

Risk-Based Testing Techniques

Risk-based testing is broadly categorized into two approaches: lightweight and heavyweight techniques. 

While both rely on the expertise and judgment of testers and developers, they differ in how risks are analyzed, prioritized, and addressed.

Lightweight Risk-Based Testing

Lightweight risk-based testing focuses on quick, high-level risk assessments to guide testing efforts. 

The method relies on qualitative judgments rather than complex calculations, estimating likelihood (probability of failure) and severity (impact) to prioritize areas for testing.

This approach is efficient for fast-moving projects where teams need to balance speed and thoroughness. 

Testers categorize risks as high, medium, or low based on past experiences, business priorities, and technical complexity.

Among the lightweight techniques are:

Product Risk Management (PRisMA)

This technique helps teams systematically identify, prioritize, and manage risks throughout the software lifecycle. 

It applies risk reduction, avoidance, transfer, and acceptance strategies, ensuring that high-risk areas receive proper attention.

Pragmatic Risk Analysis and Management (PRAM)

This technique prioritizes and implements risk mitigation strategies. You evaluate, rank, and address risks by reducing, avoiding, or accepting them. 

Testers can focus on the most important threats with this approach.

Systematic Software Testing

This method organizes testing efforts using predefined processes to maintain consistency and repeatability. 

It includes setting clear testing objectives, creating a test plan, and designing comprehensive test cases that align with software risks.

Heavyweight Risk-Based Testing

Heavyweight risk-based testing takes a detailed, data-driven approach to risk assessment. 

It is used for high-stakes applications, such as financial systems, healthcare software, and security-focused platforms, where failure could result in significant damage.

The main heavyweight techniques are as follows:

Cost of Exposure

This technique quantifies the financial risk of failure. It calculates the probability of a defect occurring and multiplies it by the potential cost of failure in production. 

It takes into account the likelihood of failure in production, expected financial loss per failure and cost of testing to prevent failure.

If the cost of failure outweighs the cost of additional testing, resources should be allocated to mitigate the risk.

Failure Mode and Effect Analysis (FMEA)

FMEA is a structured approach to identifying software failure points. It analyzes failure modes, causes and effects. 

Teams can prioritize failures based on severity, likelihood, and detection difficulty and implement mitigation measures before they impact users.

Quality Functional Deployment (QFD)

In QFD, we translate end-user requirements into software design, development, and testing goals. 

It helps prevent misinterpretation of user needs, which could introduce quality risks. It makes sure every decision is aligned with real-world expectations and risk levels.

Fault Tree Analysis (FTA)

FTA visually maps failure causes and their relationships using a tree-like diagram. It helps teams trace back failures to their root causes, whether they arise from design flaws, coding errors, or system dependencies.

It considers both observed and potential failures. Root cause analysis is performed, moving from defect symptoms to underlying errors. 

Risk-Based Testing Process

Risk-based testing involves four key steps: identification, evaluation, planning, and execution.

Here’s a breakdown of each step:

risk-based testing process

1. Identification

The first step in risk-based testing is to identify potential risks that could impact the software. 

These risks could stem from complex code, business-critical functionalities, frequent changes, security vulnerabilities, or known problem areas from past projects.

To identify risks, teams use techniques like assumption analysis, brainstorming, past defect analysis, risk checklists, and expert input from developers, testers, and stakeholders. 

Once identified, risks are categorized as high, medium, or low, helping testers prioritize what needs the most attention. Early risk identification helps reduce expensive fixes later in development. 

This is why risk-based testing often follows a shift-left approach, addressing risks as early as possible.

2. Evaluation

Once risks are identified, the next step is to assess their severity and likelihood. Not all risks require immediate attention, as some pose a bigger threat than others.

Teams typically evaluate risks based on two factors:

  • Likelihood: How probable is it that this risk will occur?
  • Impact: What are the consequences if it does?

Teams can prioritize risks more effectively by assigning a high, medium, or low rating to both factors. 

Some teams also quantify risks using a risk matrix, where high-impact, high-likelihood risks take top priority.

This evaluation helps optimize resources, ensuring testing efforts focus on what truly matters rather than spending time on low-risk areas.

3. Planning and Strategy

Once risks are ranked, the next step is to plan how to test them effectively. This includes:

  • Choosing the right testing techniques (e.g., exploratory testing for unknown risks, automated regression testing for high-risk functionalities).
  • Deciding test coverage based on risk priority
  • Allocating resources based on time, budget, and expertise available.
  • Defining risk mitigation strategies, such as preventive measures or fallback plans if a high-risk feature fails.

At this stage, teams outline the scope of testing, including the budget, testing timelines, and responsibilities. 

It keeps testing targeted and efficient, avoiding unnecessary testing of low-risk areas without sacrificing quality.

4. Execution and Monitoring

Once the plan is in place, testing begins. This phase involves:

  • Executing test cases and exploratory tests based on the risk priorities.
  • Monitoring the test results closely to identify recurring risk patterns.
  • Tracking defect trends
  • Reevaluating risks continuously

Automating regression tests for high-risk areas helps teams detect failures quickly without adding manual effort. 

Once a testing cycle is complete, the process starts again, continuously adapting to new risks as the software evolves.

Measuring the Success of Your Testing Efforts

To measure success, you must assess how well testing efforts align with business priorities, prevent failures, and optimize resources.

Here’s how to evaluate the effectiveness of your risk-based testing strategy:

1. Risk Coverage and Defect Prevention

The core goal of risk-based testing (RBT) is to ensure high-risk areas receive the most testing attention while minimizing defects in critical functionalities. 

To measure success, teams should track a few key points. First, consider risk coverage. Are the highest-risk features thoroughly tested? Testing should focus on areas that could cause significant business or security impacts if they fail. 

Next, look at defect leakage. How many critical defects slip into production? A low defect leakage rate suggests that risk prioritization is working effectively. 

Also, think about the defect detection rate (DDR). Are the most severe defects caught during testing rather than by end-users? 

RBT should identify and fix issues before release, reducing costly post-production failures.

2. Test Efficiency and Resource Optimization

Since risk-based testing focuses on prioritizing testing efforts, success should be measured by how efficiently testing resources are utilized. 

First, consider the time spent on high-risk features. Most testing efforts should be spent on high-impact areas, not low-priority features. 

Next, look at test execution time. Risk-based prioritization should help optimize test cycles, ensuring critical paths are tested quickly without delays. 

Also, think about the return on investment (ROI) from automation. In risk-heavy environments, automation should be used where it provides the most value.

3. Business Impact and Stability

Testing should align with business objectives and reduce risk exposure for end-users.

First, check if there is a reduction in business-critical failures. Are mission-critical functions, like payment processing and security features, stable after release? 

Next, see if there are fewer production incidents. If post-release issues are decreasing in high-risk areas, the RBT strategy effectively prevents major disruptions. 

Also, consider compliance and security adherence. For regulated industries, fewer compliance violations or security breaches indicate that testing successfully addresses risks in these areas.

4. Adaptability to Changing Risks

Risks change over time as software features evolve, new security threats pop up, or business priorities shift. A good risk-based testing approach is flexible and always improving. You can look at a few things to see how well it’s working. 

First, consider how often risks are rechecked. RBT should keep up with new risks and not stay the same. Also, see if tests are adjusted based on new risks. If testing priorities change with evolving risks, it shows a proactive approach. 

Finally, think about what stakeholders say. Are project stakeholders and business teams confident that testing focuses on the most critical risks?

Challenges Involved with Risk-Based Testing

Risk-based testing helps teams prioritize high-risk areas, but it comes with challenges that can impact its effectiveness. 

Understanding these challenges is essential to identify critical risks without overlooking other important aspects of software quality.

Risk of Missed or Incomplete Test Coverage

Since risk-based testing focuses a lot on high-risk areas, lower-risk parts might not get enough attention, affecting the overall user experience. 

If risks are misjudged, important defects in “low-risk” areas might go unnoticed. 

This is especially tricky in complex applications where a wrong risk assessment can mess up the whole testing process.

For example, in a new virtual reality gaming app, the lack of historical data makes it hard to know which risks to prioritize. This increases the risk of missing issues in areas that may appear less critical but are nonetheless important.

Over-Reliance on Human Judgment

Risk-based testing relies on team members’ experience and intuition to assess risk, but human biases can affect prioritization. 

Testers might overestimate or underestimate risks based on past experiences instead of objective analysis, leading to misallocated testing efforts.

For example, if a developer had a bad experience with a third-party integration before, they might see it as high risk, even if the new version is more stable. 

This can shift focus away from high-risk areas, leading to ineffective test prioritization.

Requires Continuous Reassessment

Risk-based testing is an ongoing process, unlike traditional testing methods, because risks change as the software evolves. 

This means the testing team has to continuously monitor, update, and allocate resources, which can increase their workload.

For example, a gaming app that frequently updates its content and game mechanics needs constant risk reassessment to prioritize new risks, adding to the team’s effort.

Not Always Suitable for New or Exploratory Testing

Risk-based testing works best when risks are clearly defined, but it might not be the best usability or exploratory testing approach. 

These types of testing rely on human intuition and on-the-spot evaluation, which RBT doesn’t always cover.

For example, in an eBook reader app, usability testing focuses on user experience, ease of navigation, and readability. 

These areas might not be prioritized effectively by RBT because they don’t fit into typical risk categories.

Requires Deep Technical and Domain Expertise

Successfully implementing risk-based testing requires a deep understanding of the application’s domain, potential risks, and business impact. 

Smaller teams or startups might find this challenging if they don’t have the expertise to assess risks accurately.

For example, a startup developing a wearable fitness tracker might not have healthcare and IoT experts on their team, making it hard to apply RBT effectively to medical compliance and security risks.

Risk-Based Testing vs. Other Testing Approaches

Understanding how risk-based testing compares to other testing methodologies is crucial for selecting the most effective strategy for your project. 

Below, we explore the distinctions between RBT and traditional testing, test automation, and exploratory testing.

Aspect Risk-Based Testing (RBT) Traditional Testing Test Automation Exploratory Testing
Focus Prioritizes high-risk areas Aims for extensive coverage of all features Automates predefined test cases Unscripted, focuses on discovering defects through exploration
Approach Risk assessment to guide testing efforts Comprehensive test plans treating all components equally Uses scripts and tools to run tests automatically Relies on tester’s intuition and experience
Best Use Case Fast-paced environments like Agile and DevOps, where frequent releases demand smarter testing strategies Projects with ample time and resources for thorough testing Repetitive tasks, regression testing, and scenarios where consistency is crucial Complex applications where unexpected issues need to be discovered
Resource Allocation Focuses resources on high-impact areas Spreads resources evenly across all features Requires investment in developing and maintaining test scripts Requires skilled testers who can think creatively and explore the application deeply
Risk Management Proactively identifies and mitigates high-risk areas May not effectively prioritize high-risk areas Ensures consistency and speed, but may not address all high-risk areas Can uncover unexpected issues, but may miss systematic coverage of high-risk areas
Integration with Other Methods Can incorporate both manual and automated testing methods Primarily manual testing Can be part of RBT or traditional testing strategies Can be part of RBT, especially for high-risk areas needing in-depth investigation

Risk-Based Testing vs. Traditional Testing

Traditional testing often involves detailed plans for extensive coverage, treating all components equally. This can be time-consuming and might not efficiently address critical vulnerabilities. 

In contrast, RBT prioritizes testing efforts based on the potential risk each component poses. 

Critical issues are identified and mitigated with RBT, optimizing resource usage and improving overall software quality.

Risk-Based Testing vs. Test Automation

Test automation runs pre-set tests automatically, which is great for repetitive tasks. It saves time but needs an initial setup and maintenance. 

RBT can use automation but isn’t limited to it. It focuses on high-risk areas, whether tested manually or automatically. 

The main difference is RBT’s focus on risk to guide what gets tested first. 

For instance, in a banking app, automated tests might be used for routine transactions, while RBT ensures that new, high-risk features like fraud detection are thoroughly tested.

Risk-Based Testing vs. Exploratory Testing

Exploratory testing is more flexible and unscripted. Testers explore the software to find issues using their intuition and experience. 

RBT is more structured, assessing and prioritizing risks to guide testing. While exploratory testing can be part of RBT, especially for high-risk areas, RBT provides a bigger picture. It ensures testing is thorough and focused on the most critical risks. 

For example, exploratory testing might uncover unexpected user experience issues in a new mobile game, while RBT ensures that critical game mechanics are stable and secure.

Best Practices for Risk-Based Testing

To make risk-based testing as effective as possible, it’s essential to follow some best practices. Here are the key points:

Identify Critical Risks Early

The sooner you identify risks, the easier and cheaper they are to handle. During the planning phase, teams should hold risk analysis sessions to find areas most likely to fail or have a big business impact. 

You can avoid surprises later by catching risks early and developing proactive solutions.

Foster Collaboration Across Teams

RBT isn’t just the tester’s job. It needs input from multiple stakeholders to identify all risks. Developers, testers, business analysts, and product owners should work together to evaluate risks from both technical and business perspectives. 

Open communication ensures no critical risk is missed, leading to better test coverage and prioritization.

Conduct Comprehensive Risk Assessments

A thorough risk assessment is crucial to determine which areas need the most attention. A risk assessment involves identifying and evaluating potential risks and determining the likelihood of failure based on complexity and past defects. 

Team members can create a clearly defined plan for prioritizing testing efforts by thoroughly assessing risks.

Prioritize Testing Based on Risk Impact

Not all risks are equal. Some failures might cause major disruptions, while others might have minor effects. 

Instead of spreading testing efforts evenly, teams should prioritize high-risk components. 

This ensures the most crucial parts of the software are tested first, reducing the chance of business-critical failures.

Use Test Automation for High-Risk Areas

Automation is key in RBT for testing high-risk areas frequently and efficiently. 

Test automation reduces manual effort, detects new risks from code changes, and provides faster feedback to developers, catching defects early. 

By automating repetitive and high-risk test cases, teams can increase efficiency and reliability in testing.

Continuously Reassess Risks Throughout Development

Risk levels change as development progresses. New features, dependencies, and external factors can introduce new risks. 

RBT should be an ongoing process with regular risk assessments to update testing priorities. 

Continuous risk evaluation ensures testing stays aligned with evolving project needs, preventing unexpected failures in production.

Risk-Based Testing in Agile

In Agile, you aim to deliver functional software quickly, often within short sprints. This tight timeline makes it hard to test everything thoroughly. That’s where risk-based testing comes in. 

By focusing on high-risk components, you manage your time and resources better, ensuring that critical functionalities are solid and reliable. To successfully integrate RBT into Agile processes, you should follow these steps:

Collaborative Risk Assessment

Get your cross-functional teams, including testers, developers, product owners, and scrum masters, to identify and evaluate potential risks. 

This collective insight ensures you comprehensively understand what could jeopardize your project’s goals.

Prioritization of Testing Efforts

Once you’ve identified the risks, categorize them based on their potential impact and likelihood of happening. 

Focus your testing on areas where failures would have the most severe consequences, aligning with both customer and business priorities.

Continuous Risk Reassessment

Agile projects are dynamic, with changing requirements and features. 

Regularly revisit and update your risk assessments to reflect these changes, ensuring your testing efforts stay aligned with the current risk landscape.

Integration with Agile Practices

Incorporate risk considerations into your Agile artifacts and ceremonies. For example, during sprint planning, make sure high-risk items are given priority. 

Define clear acceptance criteria that address identified risks, and include risk-based test cases in your definition of done.

Final Thoughts

Risk-based testing is a smart way to focus on what really matters. It makes sure the high-risk parts of your application get tested thoroughly. 

This saves time and resources. Instead of testing everything equally, RBT focuses on the critical features. This reduces the chances of big problems in production.

By using risk assessment techniques, you can prioritize the most critical areas. Combine manual and automated testing to deliver stable, reliable, and secure software. 

Whether you’re working in Agile, DevOps, or traditional environments, RBT helps make your testing efforts more efficient and impactful.

But to do RBT right, you need expertise, teamwork, and the right tools. That’s where Testlio comes in. Testlio offers expert testers and structured risk assessment strategies. We provide scalable test execution to prioritize your highest-risk areas.

Jumbotron image

Get in touch with Testlio today to boost your risk-based testing efforts and help your software succeed.

You may also like

  • Advice What is a Bug Report? How to Write Your Own [+ Template]
  • Advice Android Test Automation: Why & How You Can Automate Testing
  • Advice Unit Testing vs Functional Testing: Differences & Similarities
  • Advice Top 10 Software Testing Companies in 2025
  • Advice A Complete Guide to Prioritizing Test Cases
  • LinkedIn
Solutions
  • Manual Testing
  • Test Automation
  • Crowdsourced Testing
  • Outsourced Testing
Coverage
  • Payments Testing
  • AI Testing
  • Localization Testing
  • Functional Testing
  • Regression Testing
  • Mobile App Testing
  • Web App Testing
Work
  • Work at Testlio
  • Freelance
  • Testers
Company
  • Clients
  • Events
  • News
  • Notices
  • Privacy Policy
  • Terms of Use
  • Contact Us

Subscribe
to our newsletter